It allows us to combine strategic knowledge on the client side with regards to their business, and our own design knowledge about how buildings work and are constructed.. Our creative use of digital construction technologies allows us to supercharge this process.
Platform components create superstructures, which, while a relatively small proportion of the cost, are critical in maximising the accuracy of the installation.The superstructure is highly dimensionally accurate, with fixings designed in to enable high levels of accuracy in the complementary elements that attach to it.
This accuracy reduces the need for tolerance between interfaces, which is where issues often occur.On The Forge, the tolerance was reduced to.5mm over a 9m bay..
This accuracy also unlocks existing, but underutilised capabilities in the supply chain, encouraging optimisation of their products too.In fact, a range of complementary elements have already been developed and delivered on The Forge..
Developing the façade solution around the structural platform at an early stage, allowed us to really optimise the use of materials and detailing and create the most efficient units for handling in the factory and on-site.. Wojciech Brozyna, Managing Director, Alupro.
Accuracy in installation is achieved via factory conditions on site:.If every occupant has to have the space, power and connectivity to work effectively?
And what will we do with that space if it’s not needed, if the occupants have jobs that can’t be done at home?.How will we design and build offices, if there’s the possibility that they might have to be re-purposed for domestic, healthcare or manufacturing purposes?
How will we adapt workspaces, ventilation, lifts and kitchens so that we can keep working if (when) new viruses arrive?What can we do with existing buildings?.